Perforce · ALM migration

Helix ALM to Codebeamer

Unify requirements, tests, issues, folders, links, and workflow history in a modern Codebeamer operating model.

Guide overview 10 min

Complexity

Structured

Primary domain

ALM

Planning baseline · Reviewed July 2026

01 / Context

Start before the first export.

Helix ALM commonly separates requirements, test cases, test runs, and issues while linking them across the lifecycle. The target design should retain that coverage and evidence while simplifying legacy folders, fields, and state machines.

Unified lifecycle model
Preserved test coverage
Simplified workflow states
Auditable execution

02 / Scope

What can move?

Migration scope should be decided by business value and evidence obligations—not by what is easiest to export. The following entities are typical starting points for Helix ALM.

01

Projects

02

Requirements

03

Issues

04

Test cases

05

Test runs

06

Folders

07

Links

08

Attachments

03 / Mapping

Source concept → target intent.

The target should express how teams will work in Codebeamer. These are common design patterns, not guaranteed one-to-one conversions. The final decisions belong in a version-controlled mapping specification and must be validated against the source version, available APIs, and agreed target configuration.

Common Helix ALM source concepts and possible Codebeamer target patterns
Helix ALMPossible Codebeamer patternDesign note
Requirement documentTracker + document viewMaintain order and requirement hierarchy.
IssueDefect / work item trackerMap types, states, ownership, and severity.
Test caseTest case tracker itemPreserve steps, parameters, and requirement links.
Test runTest run / execution recordSelect evidence based on retention needs.
LinkAssociationValidate coverage across requirement, test, and issue domains.

04 / Failure modes

What can break.

01

Test evidence volume

Historical runs can dominate volume while providing little ongoing value.

02

Cross-domain identities

Requirements, tests, and issues may use separate numbering and link conventions.

03

Workflow carryover

Legacy state machines often contain inactive transitions and obsolete governance.

05 / Plan

Five steps to cutover.

01

Define retention tiers

Separate active operational data, audit evidence, searchable archive, and disposable history.

02

Design the lifecycle model

Create target trackers and associations for requirements, tests, runs, and issues.

03

Map fields and identities

Preserve source keys, normalize users and values, and define deterministic transforms.

04

Pilot end-to-end coverage

Migrate a requirement through linked tests, executions, and defects to prove traceability.

05

Scale in controlled batches

Load, reconcile, review exceptions, and repeat using the same governed pipeline.

06 / Validation

Validate meaning, not only counts.

A defensible validation pack combines automated reconciliation with human review. It should show what moved, what changed by design, what failed, who accepted each exception, and which source snapshot the target represents.

Structural

Counts, types, hierarchy, fields, attachments.

Relational

Links, direction, coverage, reuse, versions.

Operational

Workflows, permissions, reports, user acceptance.

When scripts stop scaling

Build a repeatable workflow.

When repeated rehearsals, large volumes, relationships, or evidence requirements make one-off scripts difficult to control, purpose-built tooling can help. Product scope still needs to be confirmed against the source system, version, data model, and target design.

Read the NANGA Migrator overview

07 / FAQ

Early migration questions.

Do all historical test runs need to move?

Usually not. Keep runs required for active work, regulation, contracts, or audit; archive the remainder under an approved retention plan.

Can requirement-to-test coverage be preserved?

It often can be retained when source IDs are mapped persistently, both endpoints exist before links are created, and coverage is reconciled after migration.

Can Helix folders become Codebeamer folders?

Sometimes, but folders may also represent document order, ownership, or classification. Map the underlying intent to the correct target construct.

Continue your plan

Turn findings into decisions.

This guide clarifies the source side. Next, connect those findings to the target operating model and decide how the migration will be delivered.

Optional expert support

Strategic Migration Consultation

Use one representative Helix ALM project to test scope, target architecture, mapping risks, validation, and cutover assumptions before committing to full delivery.

Consultation delivered by NANGA SYSTEMS

A useful first conversation clarifies

Scope and risk

Clarify the source landscape, representative scope, and the uncertainties that need evidence.

Target decisions

Identify the Codebeamer structure, mapping choices, and operating-model questions to resolve.

Evidence and next step

Define how results will be validated and what the most useful first migration wave should prove.